Gerente de produccion / operaciones
Chr*** ***** (XX años)
Production Manager en Autoliv
INSTITUTO TECNOLOGICO DE MATAMOROS
Matamoros,
Tamaulipas
Este candidato esta dispuesto a trasladarse
|
Experiencia
Production Manager
Autoliv
jul 2018
-
Actualmente
• 1,300 employees under my charge (16 employees direct) • Organize workflow to meet specifications and deadlines • Monitor production to resolve issues • Ensure output meets Quality standards • KPI’s: Safety, Quality (scrap, yield, customer complains), OEE, LMPU & OTD • Determine amount of necessary resources (workforce, lines, raw materials, etc) • Estimate costs and prepare budgets (per program and customer). • Remove waste and constraints from the production process to improve efficiencies and enhance productivity. • BMW, Mercedes, GM, Honda, KIA, Hyundai & Mazda lines.
Autoliv Production System Manager
Autoliv
jul 2016
-
jul 2018
• Process / Industrial Engineering & APS Department under my charge • Under my charge: 8 Industrial Engineers + 7 Process Engineers + 1 Project Engineer + 3 APS assistants • Balancing lines, Process flow charts, cell design, Part presentation, Process control, Work instructions, Route design, VSM, Plant Layout, PFMEA & continuous improvement workshops. • Product Life Management (PLM) responsible • KPI’s: PD, Cost savings report, LMPU reduction, WS dashboard, ZD 15 days, Layout footprint savings, OEE & Budget • Monitoring Department expenses – Budget Control of 1.1M USD • Trainer: APS University (Top Management) & APS Academy (Middle Managers) • Remove waste and constraints from the production process to improve efficiencies and enhance productivity. • Zero Defect program responsible (2017 Best year of the history of Autoliv Matamoros in terms of Zero Defects) • Kaizen shop area under my charge (8 workers)
Plant Manager
IAI Plant 5: Plews & MPD customers
jun 2015
-
jun 2016
• Accomplish Sales and Revenue yearly goals (12M/year). • 250 employees under my charge (8 people report direct to me) • Short and long term plans in a bid to increase the efficiency and profitability of the plant. • KPI’s: Safety, Quality PPM’s, Yield, Delivery, Inventory turns, OEE, Turn over. • Develop and execute the plant manufacturing budgets and monitoring the expenses. • Allocate the correct human & equipment resources & direct production employees to attain all established goals. • Waste elimination to improve efficiency • Provide leadership for the successful day-to-day operation of the facility. • Cost reduction: Operation cost 7% reduction per year.
Director of Lean Manufacturing
IAI Kasco Corp
jun 2008
-
jun 2015
• Lead Engineering Departments (IE, PE, NPI & Business transfers) • Responsible to create an Annual Lean deployment plan per site (5 Sites: Mexico, 2 in USA, UK & France). • Lean Budget Control over 450K usd / year • Responsible to Implement Lean concepts and improve overall plant performance • Train the union and non-union employees (all levels) in Lean tools. • Responsible to implement Lean Culture & create Lean environment around the sites • Cost reduction projects (Target $2M per year) • Planning, prepare & conduct all Kaizen events • Prepare and display Lean report by month (President’s letter)
Kaizen Manager / ACE Coordinator
Kidde Fire Extinguishers
ene 2007
-
jun 2008
• Responsible to develop Kaizen events to improve performance plant & cost savings • Responsible to implement ACE Culture (Lean Mind) • Responsible and Leader in all Plant projects, regard ACE, Kaizen and Process control concepts. • Responsible to training all employees in ACE training (Lean Mfg. tools) • Responsible to create a deployment plan to obtain the ACE levels • Develop and to be Facilitator for all Kaizen events • 7 Pilots under my charge (HR, Engineering, Maintenance, Internal supplier, Materials, Quality and Finance)
Operations Manager
Leon Plastics
feb 2006
-
dic 2006
• Accomplish Sales & Revenue targets (240M usd / year) • Foam injection, Molding and Assembly lines Responsible (1st, 2nd, and 3rd. shift production) • Quality, Maintenance, Material & Logistic departments under my charge • Optimize Capacity Machine Utilization & Human Resources • Improve the Labor Efficiencies (waste elimination) • Scrap control and reduce the quality issues (Apply Six sigma methodologies) • Establish metrics controls in all Areas: OEE, Schedule Attainment, Machine utilization, FTQ. • 28 Salaries and 300 operators under my charge.
Formación
Industrial Engineer
INSTITUTO TECNOLOGICO DE MATAMOROS
ago 1996
-
dic 2001
Carrera en Ingeniería Industrial
Idiomas
Ingles - Conversacional (90%)
Currículums relacionados