Bss engineer, ran engineer, test engineer, site engineer, qa engineer, coordinator, assistant manager, project manager

Aht*** ***** (XX años)
Regional Manager en Netkom
University COMSATS university Institute of information & technology
Tlalpan,
Ciudad de México
Este candidato esta dispuesto a trasladarse
|
Experiencia
Regional Manager
Netkom
feb 2018 - jul 2019
Nokia:
Manage all logistics for site preparation as per project requirement.
Prepare all inventory FSMF, FPFH, FXED and report.	
Overall support to project network plan & design plus implementation teams.
Responsible of swap & expend Nokia FSMF with in region.
Insure the cluster completed for pre swap.
Manage multiple teams with strong follow up.
Supervise planed swap sites till offer for pre-PAT.
Responsible for all level snags to resolve regarding site installation and prepare As-built data site vise.
Responsible for site acceptance from customer.
Ensure the sites quality and standard.
Managing preventative, maintenance for Nokia VEON.

PTCL:
GPON FTTx planning
OSP/ISP project design, cost estimation
Involved in project moving from legacy network to GPON (FTTH)
Planning for ISP and OSP for GPON-FTTH sites and execution of projects involving business feasibility, technical evaluations, cost analysis for projects, to ensure end to end delivery and capitalization of projects within committed timeline.
Conducting surveys of sites to develop HLD and LLD.
Link budgeting of FTTH networks to ensure quality of service.
Managing installation/commissioning/deployment of ODN equipment and testing of sites.
Managing the development and O&M of GPON projects of region.
BO Engineer
Huawei technologies
oct 2016 - ago 2017
2G/3G/LTE experience.
Handled ring implementation & shifting of traffic activities.
Rerouting & migrations of traffic from one BSC to another.
Installation and commissioning 3G/LTE(BTS3900), 2G (BTS3900) 
E line, ELAN Ethernet configuration.
Trouble shooting of all the faults.
Ensuring complete prevent maintenance of BTS, BSC sites as per the schedule.
BSS alarm handling, trouble ticket management, escalation management and co-ordination with field maintenance ensuring complete prevent maintenance of BTS, BSC sites as per the schedule. 
BSC health checks & Backups
Network performance (KPIs)
Software up gradation of network elements
RTN Microwave
Prepared network design including all levels board 2G/3G/LTE VLANs & network DCN plan.
Microwave configuration & fault rectification RTN 910,950,905 series.
Planning for microwave link configuration
Clearing critical, major & minor alarms.
Troubleshooting & fault rectification of transmission equipment’s.
NEC Microwave
Prepared MW-TXN-Network design as per plan.
Prepared XPIC link.
Prepared Microwave transmission implementation.
Prepared network design including all levels board 2G/3G/LTE VLANs & network DCN plan.
3G Microwave cutovers from BSC to Node.
Overall support to projects network plan & design plus implementation teams.
Configuring Ethernet services including DCN implementation, VLAN configuration and testing E2E
Media from site to BSC.
Complete media clearance till BSC.
E2E media verification from site to BSC through ping test.
Monitoring alarms on Node PNMSJ server client and rectification of these alarms.
RAN Engineer
ZTE
jun 2015 - feb 2016
Working as a RAN Engineer in ZTE, My responsibilities includes,
Swap Ericsson (6000 family to ZTE8910 SDR cabinet).
Configure SDR with MO files and integrate site by verifying media through ping test by cola soft.
BSS & Transmission system testing support.
BSS & TXN services.
Soft and hard expansion’s
Deeply understanding of RRU cascading (8863,8881 of 2G/3G/4G)
Shifting of TN from Ericsson 6000 cabinets to ZTE 8910 and verify its RSL.
Antenna’s audit according to its Electrical, Mechanical tilts, azimuth and heights.
Troubleshoot all internal and external site alarms also verify to customer NOC.
Supervise site quality IDU/ODU according to customer standard point of view upload data at EPMS.
Troubleshoot site snags before customer ATP visit.
Perform post swap activities & prepare PAT/FAC documents.
ZTE SDR BC8910A:
Supervision of installation, commissioning and configuration of ZTE Radio Base Station SDR BC8910A. Sound knowledge of operation & maintenance terminal version LMT and EOMS version with the handling of O&M activities. Supervise the installation of IDU/ODU equipment such as GSM antenna, duplex-er and feeder system. Experienced Sweep test, VSWR and DTF Experienced on site acceptance. Conduct troubleshooting of alarms that occurred in SDR BC8910A during malfunction of equipment such as BBU, RRU8863, RRU8881 and any other alarm that occur from the RBS. Working experience with RAN fault finding and fault assessment. Basic core network knowledge in to identify problems outside the RAN.
RAN Engineer
Ericsson
nov 2014 - abr 2015
Troubleshooting, commissioning and configuring of Ericsson Mini-link Traffic Node 2P, 6P, 20P includes MMU2B, MMU2C, and MMU2E for STM-1 and MMU2F for 2xSTM-1 Link, LTU16x2, LTU16x1, LTU155e/o, NPU1B, NPU2, NPU3, and NPU8x2 as per MUX Plan.
Configuration of all Traffic Nodes and MMU's, LTU's and in case of any fault occurrence its troubleshooting and provide remedy.
Configuration of for new AMMs, MMUs, LTUs (16, 32, 155), 1+1 link & XPIC links.
Providing support remotely/locally for link alignment & equipment installation according to link budget/drawing.
Responsible for SBL upgrades where require.
Responsible for release 4 upgrade project where 1300 TN's are being upgraded from R3 to R4 along with MMU's and magazines NPU3C.
Hands on experience of configuration of MMU 2D, MMU2H NPU1C and NPU3C.
E2E E1 & Traffic routing.
Making of media cross connections both logical and physical from ADM to end point.
DCN implementation in Traffic Node (20P, 6P, 2P).
Configuration of XPIC link (Cross polar interference canceler), while maintaining XPD value.
Commissioning of Ericsson’s PDH and SDH MW transmission systems.
DCN Implementation in Traffic Node (20P, 6P, 2P) Visibility of sites on NMS.
Ericsson T.N Release 3 & 4 commissioning XPIC, SD, PDH, SDH link commissioning, troubleshooting acceptance. 
Having good experience of Mini link Craft 2.01,2.2,2.3 & 2.4 
Commissioning of 20p,6p,2p revision 3 & 4
Upgrade the TN release.
Upgrade the RAU release.
Upgrade TN 2p to 6p or 20p.
Operation and maintenance of TRM
Acceptance of site with customer.
Resolve the TRM issues on site given by OMC.
BSS Engineer
Myson Engineering System
abr 2013 - sep 2014
Huawei - ZTE 
Prepared MW-TXN-Network design for swap project.
Prepared swap solution for the project.
Prepared MW transmission implementation & cut-over plan & training.
Prepared network design including all levels board 3G VLANs & network DCN plan.
3G Microwave cut-overs from NEC to RTN.
Overall support to projects network plan & design plus implementation teams.
Configuring Ethernet services including DCN implementation, VLAN configuration, QoS, implementation, integrating iPasolink network with PTN Nodes and testing E2E media from site to BSC.
Configuring LAG on iPasolink for Integration with ZTE PTN at Optical Node sites.
Complete media clearance till BSC.
E2E Media verification from site to BSC through ping test.
Monitoring alarms on NEC PNMS Server client and rectification of these alarms.
Troubleshooting of NEC iPasolink200, iPasolink400 and iPasolink1000.
Providing support remotely.
Installation, commissioning and troubleshooting of ZTE SDR BTS8700, BTS8800, BTS8900.
Installation of ZTE W301, T601 rectifier.
Dismantling of Old Power One, Eltek and Delta power rectifier.
Dismantling of Old Nokia Flexi Hopper MW equipment.
Dismantling of Old NEC ( Neo, V4) MW equipment.
Dismantling of Nokia Ultra, Flexi BTS.
Conducting complete power swap activity.
Transmission planning and connectivity diagram using Path loss planning tool.
Making the Nominal/PIP planning.
Supervision of LOS surveys (Path survey, Flash test, Mirror test, Balloon test) done by subcontractors.
Providing support remotely.
TSSR supervision and management.
Checking reports submitted by design team of subcontractors and represent to customer (Telenor).
Rectifying all the technical snags in the reports.
Save all parameters pre-commissioning and alarms OMES.
Coordination with higher authorities of ZTE & Telenor Pakistan.
Verify all the equipment accordingly plane.
Managing PAT document from beginning for ZTE/TP.
Supervise complete installation and fixing.
Responsible for all activities of 3G upgrade on site.
Media clearance site to site including 3G VLAN setup and ping test.
Make sure all installation according to DED plane.
Commissioning 3G parameters with OMES, Troubleshoot and clear all related alarms on site from BSC.
Make sure quality as per ZTE/TP standard.
Perform ATP with client. 
RNC (3G) ZXUR-9000 installation as per plan.
CE rack ZXUR-10 installation as per plan.
RNC & CE Rack power up & check.
Insert RNC boards (OMM, OMP, EGPB, EGBS, EGFS & USP) in RNC shelves as per plan.
Make inter connectivity among shelves through data cables & fiber cables.
Make connectivity between RNC shelves and CE Rack through data cables.
Make connectivity between CE Rack & PE through data cables.
Make connectivity between CE Rack & PTN through fiber cables.
ZTE SDR (8800, 8900A, 8700) commissioning.
Perform ATP with client of BSS (RNC, CE Rack).
Assistant Manager
Relacom
mar 2012 - mar 2013
Managing multiple teams for RBS/Mini-Link on swap activity.
Coordination with higher authorities of Ericsson Pakistan.
Manage summary of missing material and provide accordingly.
Ensure the sites quality and standard.
Responsible for all pre-swap activities within region.
Managing preventative maintenance for Mobilink of RBS/Mini-Link in Region.
Managing O&M for RBS swapped sites of Ericsson/Mobilink.
Site Engineer                                                                                       
Installation, integration and commissioning of RBS 2000 family.
Installation, integration and commissioning of RBS 6000 family 6301,6101,6201, TRM.
TRM upgrade hardware and software.
Installation, integration and configuration of OSP Cabinet (Emerson/Delta with BB).
Troubleshooting of RBS faults. 
Expansion of RBS.
Expansion of TRX 2G/3G/LTE
Hands on experience on OMT for RBS.
Alarm verification.
Troubleshooting, commissioning and configuring of Ericsson Mini-link Traffic Node 2P, 6P, 20P includes MMU2B, MMU2C, and MMU2E for STM-1 and MMU2F for 2xSTM-1 Link, LTU16x2, LTU16x1, LTU155e/o, NPU1B, NPU2, NPU3, and NPU8x2 as per MUX Plan.
Configuration of all Traffic Nodes and MMU's, LTU's and in case of any fault occurrence its troubleshooting and provide remedy.							       Configuration of for new AMMs, MMUs, LTUs (16, 32, 155), 1+1 link & XPIC links
Have the ability to provide help during link alignment and m/w equipment installation of Ericsson's all types according to link budget.
Responsible for SBL upgrades where require.
Responsible for release 4 upgrade project where 1300 TN's are being upgraded from R3 to R4 along with MMU's and Magazines NPU3C.
Hands on experience of configuration of MMU 2D, MMU2H NPU1C and NPU3C.
E1 routing, Traffic routing, (E2E E-1 routing).
Making of media cross connections both logical and Physical from ADM to end point.
DCN implementation in Traffic Node (20P, 6P, 2P).
Configuration of XPIC link (Cross Polar Interference Canceler), while maintaining XPD value.
Performing FAT and PAT activities.
Commissioning of Ericsson PDH and SDH Microwave transmission systems.
Visibility of Traffic Node i.e. 20P, 6P, 2P on NMS.
DCN implementation in Traffic Node (20P, 6P, 2P). Visibility of sites on NMS.
1. Operation and maintenance of RBS (Ericsson) 2206, 2207 and RBS 2106/2107 for both 900 and 1800 GSM network. Sites integration and troubleshooting of routine internal alarms.
2. Connectivity of sites at the time of expansion and power on activities. Routine checking and Fault attendance at traffic Nodes and Hub sites.
3. Working on MW (Ericsson) Mini link (Classic, High Capacity), Traffic Nodes.
4. Involvement in Transmission links` up gradation (cut-over) from low capacity to high capacity (Traffic node to HC and classic to Traffic node).
5. Use of All kind of Testing Tools for RBS and MW including Site Master (Anritsu S332C) & (Anritsu S331B) regarding VSWR & DTF & Software for Soft Testing of RBS and MSM for soft testing and access of Mini link.
6. Strong GSM BSS product knowledge with experience in routine maintenance and troubleshooting in the several of the following areas: OMC-R, BSC, BTS. 
7. Well-versed in the software loading for all sub-systems for upgrade and patching processes. 
8. Handling all PTCL (lease media) related issues and problems and good coordination’s with PTCL authorities.
Regional Project Manager
Giantmore telecom
may 2010 - feb 2012
Managing all the regional departments (HR, FD, WH, Com, RO, MS)
Managing and supervising all the running projects (Telenor/Zong-ZTE, Warid-Ericsson, PTCL-Huawei etc).
Attend meetings with the customers for getting more business and discussing ways to present together tailor-made solutions.
Preparation of monthly budget forecast and business forecast.
Scheduling, performance monitoring, reporting and staffing of projects.
Adjust hours of work, priorities and staff assignments to ensure efficient operation, based on workload.
Work on bids, RFI’s & RFQ’s and proposals related to the contracts.
Preparation of business cases.
Being Administrative Head (Additional charge) of region, managing all the administration related issues.
Project Planning & Controlling
Research & Deployment 
Change Management
Business Case Development
Strategic Planning
Economic Analysis
Negotiations
Finance
Budgeting
Performance
Biding
Identifying Client Needs & On-Time Delivery
Cost Control
Team Lead
China comservices
ago 2006 - abr 2010
Swap ZX-SDR (ZTE/CMPAK).
Installation of SDR [ZX-DR (8900A, 8700, 8200)].
Commissioning of ZX-SDR
Making of template files according to the configurations of site.
Installation activity for the swap of IDU/ODU Site. 
Troubleshooting of ZX-SDR.
Power swap ZX-68, BB and solar distribution.
Alarm clearance (Outdoor & Indoor).
PAT for the ZTE/CMPAK swapped sites.
O&M for ZTE/CMPAK swapped sites ZXSDR expansion (ZTE/CMPAK).
Conduction of E1 expansion to support the high configuration of sites.
Media clearance from BSC to site.
E1 patching in BSC for E1 expansion (Outdoor & Indoor).
Soft expansion (UPBG) for SDR ZTE/CMPAK
Hard expansion (RRU,RSU) to support the configuration of the site.

ZONG SDR Swap (ZTE-8700/8800/8900) Power swap (Rectifier ZX-68/BB/Solar) Central, Mobilink SDR Swap (ZTE-8800/8900) North, ZONG SDR 1088 (ZTE-8700/8800/8900) Central
Assistant Manager
Huchen telecom
mar 2004 - jun 2006
Coordination with higher authorities of Huawei/ UFone Pakistan.
Managing PAT for Huawei/ UFone.
Manage reports for Huawei/ UFone.
Responsible for all activities within region.
Managing preventative maintenance for UFone.
Alarm clearance (IDU/ODU)
Manage deployment activity for Huawei/ UFone.
BSS Engineer
Huichen telecom
ene 2003 - feb 2004
Supervision of all kind of work at GSM site
Formación
BS.c/Electrical
University COMSATS university Institute of information & technology
2005 - 2009

          
          
DAE/Electronics
International Islamic University
2002 - 2005

          
        
Idiomas
English - Conversational
Hindi - Fluent