Gerente de ingenieria y mantenimiento

Iva*** ***** (XX años)
Head of Engineering and Maintenance en Pilot Chemical CO
Universidad Iberoamericana
Ocoyoacac,
Estado de México
Este candidato esta dispuesto a trasladarse
|
Experiencia
Head of Engineering and Maintenance
Pilot Chemical CO
jul 2021 - Actualmente
KPIs implementation, 5s. 
Procedures update and develop
team integration (feedback, KPIs, Leadership) 
CAPEX and OPEX control, Budget by site, maintenance and projects, forecast and cash flow control (13 mills MXP)
GMP’s, NOM59, ISO, COFEPRIS.
Accountable for the quality documentation (procedures, protocols, reports, test) 
Energy projects, saving energy.
Project control manager
Sanofi Pauster
ene 2019 - jun 2021
Project control manager (EPC)
- KPI's for project control in time, cost and quality.
- Implementation of Lean manufacturing tools for construction and contractor control.
- Development of procedures for the project control area.
- Development of budgets, cash flow, and tracking of purchases and contractors. 
- Savings 3.5 MEuros at the moment
- Implement lean manufactures saving time in 9% in the meetings.
Sr Project Manager
Lactoproductos la loma
ene 2017 - oct 2017
Desarrollar diu diligence
Presentar comparativo de planta nueva vs planta en uso
presentas costos beneficios
definir lugar de ubicación de nueva planta
comparativo de terrenos 
tabla comparativa costos beneficios logística
Anteproyecto de planta nueva
Compra de terreno
Head of Engineer and maintenance
Covestro SA de CV
sep 2015 - may 2016
Head of Engineering and Maintenance
•	Responsible for CapEx and maintenance budget for the site.  Yearly planning, carrying out and monitoring of financial investments
•	Created technical and financial monthly reports, 
•	Followed up and monitored CapEx investment projects and maintained budgets for the operational head of NAFTA in the regional (USA) and in German headquarters.
•	All activities were done in ERP SAP FAM System IM/PS/PM. Key user responsible for the entire system in Mexico, its training program and ensuring its correct operation.
Achievements
¥	Oversaw team integration and carved out processes during reorganization (Bayer to Covestro)
¥	Implemented new engineering and maintenance organizations in Covestro: define job descriptions, administration processes and technology tools
¥	Successfully carried out Capex and maintenance budget
¥	Implemented new KPIs in the new engineering department
¥	Integrated the maintenance and engineering departments
Project Leader
Bayer de Mexico SA de CV
nov 1998 - may 2010
¥	Reported to the on-site project manager and the stakeholders. 
¥	Accountable for strategic investment in the plant (polymer, health care and crops)
¥	Responsible for defining the CapEx budget according to global production and technology requirements.
¥	Developed all projects according to global procedures (PMI)
¥	Accountable for the initiation, planning, execution, monitoring, controlling, installation, start up, quality test, and closing projects in polymer & chemical production (annual budget 1 million Euros)
Responsible for implementing all national and international norms and standards.¥	Budget. Mechanical and utilities project leader, coordinated the concept, basic and detail engineering, coordinated the contractors and purchasing, supervision, scheduling and budget. Responsible for the accounting closing.
¥	2006-2005 Polycarbonate and chemical warehouse CapEx $2 million budget. Mechanical and utilities project leader, coordinated the concept, basic and detail engineering, coordinated the contractors, purchasing, supervision, scheduling and budget monitoring. 
¥	2004 Project leader for the installation of underground storage tank. 
¥	2004-2005 Project leader for the polycarbonate plant in Monterrey NL CapEx $7.5 million dollars. Accountable for the initiation, planning, execution, purchase, monitoring, controlling, installation, start up, quality test, and closing projects.
¥	2002-2003 Project leader of mechanics and utilities for the chemical products warehouse in Leon, Guanajuato. CapEx $1.5 million budget. 
¥	2000 Project leader for storage tank installation $0.5 million dollar budget.
¥	1998-1999 Sulfonation process optimization, based on analysis of energy and mass balances, detecting faults in the distillation and cooling processes, which led to the installation of a heat exchanger reducing by the time of processing by 45% CapEx 20 TUSD.
Formación
Meastría en Ciencias en Ingeniería Química
Universidad Iberoamericana
ene 1996 - nov 1997
Maestría en Ciencias con especialidad en fenómenos de transporte, tesis corrosion en reactores vidriados, presentada en congreso Memorias del XVI International Materials Reserch Congress and the VI Congress of NASE International Seccion, Mexico, Quintana Roo, 28 de Octubre al 1º de Noviembre del 2007, ‘CORRSION OF GLASS-LINE REACTOR’
Ingeniero Químico Administrador
Instituto tecnologico y de estudios superiores de occidente (ITESO)
ago 1989 - jul 1993
Licenciatura en ingeniería química administrativa especialidad en procesos industriales, tesis presentada en XIV Congres AMIDIQ, Michoacan University, from 28 to 30 Abril, 1993. Work: “EQUIPMENT TO STUDY THE HIDRAULIC IN PAQUEG TOWEREQUIPO”. JOURNAL: AVANCES EN INGENIERÍA QUÍMICA 1993, AMIDIQ.
Idiomas
ingles - avanzado
Español - Nativo
Otros datos
Diploma en PMI
Curso de preparación y diploma para presentar certificación en PMI
Diplomado en Alta direccion
Diplomado en Alta dirección en la UIA , en procesos